Dromaxx Sp. z o.o. offers a wide range of groundwork and landscape services related to road construction and forming and maintenance of of green areas. Over the years we have performed various works consisting in land rehabilitation after the exploitation of deposits of natural aggregates, covering flat areas with a layer of fertile soil and planting grass seeds, excavation and embankment operations of thousands of cubic meters.

 Construction of the water storage reservoir in Pabianice

The scope of works included construction of the water storage reservoir with an area of 20,000 square meters.

As part of the above mentioned task Dromaxx Sp. z o.o performed works consisting in topsoiling, performing excavation operations, where the volume of the cut area was over 50,000 cubic meters, sloping and landscaping as well as transport of excavated material.

I hereby confirm that the works were completed in a timely manner and in accordance with the agreement, and that our cooperation with Dromaxx Sp. z o. o. was successful.

Budimex S.A.

 

  

  Dobroń mine reclamation

As part of the above mentioned task Dromaxx sp. z o.o. performed works consisting in reclaiming "Dobroń Duży" mine with the mining area of 136.271 square meters.

The scope of works performed by Dromaxx sp. z o.o. included among others conducting excavation operations and transportation of excavated material, landscaping, spreading a 10-cm-thick layer of fertile soil on the entire surface of the mine and demolition of temporary technological routes and access roads to the embankment.

The company demonstrated great organisational skills, it proved to be very competent and able to satisfy all the needs and requirements of the investor.
Budimex S.A.
   

 
 
                                   

  Kluski mine reclamation

Dromaxx sp. z o.o. rendered specific works under a Subcontractor Agreement as a part of the investment project: "Construction of the S8 express road along the section: Walichnowy interchange - Łódź (A1) - section 1.".

The scope of services rendered to BUDIMEX S.A. included land reclamation after shutting down mining operations (natural aggregate deposits exploitation) in "KLUSKI" mine with the area of 149.000 square meters.

Rehabilitation operations were performed based on an official decision under which the fallow land was taken back into agricultural production. The works were carried out in timely manner and in compliance with good engineering practice.

Budimex S.A.
P5020066
P5020068
P5020069
P5020072
P5020073

 

 

 

 

 Construction of a modern landfill site in Opole

Dromaxx sp. z o.o. carried out construction works related to the investment project "Construction of a modern municipal landfill site in Opole".

We constructed an embankment with a volume of the fill area of 114.000 cubic meters, we performed excavation operations in the land falling into categories 1-4, consisting in clearing out 37.000 cubic meters of earth , including excavation of more than 20.000 cubic meters of rock and  30.000 cubic meters of filtering layer.

As part of the above mentioned investment project Dromaxx sp. z o.o. also carried out the exploitation of natural aggregate deposits consisting in extraction and loading, and the works were carried out round-the-clock.

P1030354
P1030361 (2)
P1030376
P1030380
P1030421
DSC_0238
DSC_0244
DSC_0271
DSC_0230
DSC_0233

 
 

 

Forming and maintenance of green areas - The ring road of Bojanowo and Rawicz

Dromaxx sp. z o.o. performed services to Budimex S.A. under a Subcontractor Agreement as part of the overall construction project consisting in construction of the S5 express road Poznań - Wrocław.

Our works performed as part of the aforementioned construction of the ring road of Bojanowo and Rawicz, which was opened for use at the end of 2014, included formation and maintenance of green areas covering the surface of more than 1 300.000 square meters.

The works consisting in covering flat areas with a layer of fertile soil and planting grass were carried out between June and October.

Our cooperation with Dromaxx sp. z o.o. was successful. The works were carried our with due care and diligence and in compliance with good engineering practice. The company fully satisfies all the needs and requirements of the investor.

Budimex S.A.
IMG_0755

 

 

 

Forming and maintenance of green areas at Katowice International Airport in Pyrzowice

Dromaxx sp. z o.o. rendered construction works under a Subcontractor Agreement as part of the overall construction project consisting in the construction of a new runway and the necessary infrastructure at Katowice International Airport in Pyrzowice.

The works included formation and maintenance of green areas covering the surface of more than 750.000 square meters. They were carried out during the spring-autumn season in 2014.

The works were completed with due care and diligence, in accordance with the contract and in compliance with good engineering practice. Dromaxx sp. z o.o. can be recommended as a reliable partner.

Budimex S.A.
IMG_0651
IMG_0646
IMG_0648
DSC_0507
DSC_0523
DSC_0542
DSC_0556
DSC_4488
DSC_4496
DSC_4497
DSC_4499
DSC_0460
DSC_0465
DSC_0481
DSC_0485
DSC_0490
DSC_0498
DSC_0502
DSC_0504

 
 

  Clearing and grubbing along the S7 express road

 We performed works consisting in removing and disposing of trees and shrubs as well as removing and disposing of wood and root matter after clearing along the section of the S7 express road Miłomłyn-Ostróda, including the ring road of Ostróda within the section of the road no. DK16 on the surface of more than 380,000 square meters.

 

 

 Construction of access roads - S7 express road

As part of a contract involving the construction of access roads for the purposes of geological surveys, Dromaxx sp. z o.o. constructed a road embankment with a volume of the fill area of more than 52.000 cubic meters as well as loaded and transported approximately 90.000 tons of material.

 

 

 

Planting grass seeds at Szczecin-Goleniów International Airport

 As part of the investment project consisting in development and modernization of airport and port infrastructure of Szczecin-Goleniów Airport, Dromaxx sp. z o.o. rendered specific works under a Subcontractor Agreement which involved covering flat areas with a layer of fertile soil and planting grass seeds on the area of more than190.000 square meters.

 

 

 

 

 

 

 

Dromaxx

Dromaxx Sp. z o.o.
 
  ul. Objazdowa 1
  57-300 Kłodzko
  Tel.74/667-59-09 ( 8:00-16:00 )
  Tel.kom. 695-443-661
  This email address is being protected from spambots. You need JavaScript enabled to view it.
  This email address is being protected from spambots. You need JavaScript enabled to view it.

Our location

How to find us?

Head Office of Dromaxx

  ul. Stefana Okrzei 2, II piętro
  57-300 Kłodzko