Construction of service and storage yards on the premises of the Logistics Centre in the Port of Gdynia – PORT OF GDYNIA – approx. 50,000 m2 of concrete paving.

Nawierzchnia betonowa

Implementation of the concrete paving contract.

As part of the contract, we performed: 

–     placement of a top layer of C35/45 cement concrete with dispersed reinforcement

–     installation of dowels and baskets

–     reinforcement of slabs in accordance with the Technical Documentation, using materials supplied by the General Contractor,

–     impregnation of the concrete coating with a preparation in accordance with the General Contractor’s requirements.

–     the provision of compressible inserts (polystyrene, foam) at expansion joints

–     installation of manhole reinforcements from material supplied by the General Contractor. 

–     surface work carried out using SOMERO S-22 Z and WIRTGEN SP 850 machines. 

Project duration: May – November 2021